Construction Of 5No. 1,000 Metric Tonnes Grain Warehouses

Construction Of 5No. 1,000 Metric Tonnes Grain Warehouses In Middle Zone Districts Under  The  Infrastructure  For Poverty Eradication Programme  [IPEP]  – GHANA

Location within Country:
  • Adujan [Ejura]
  • Asam Mampong
  • Drobonso
  • Kumawu
  • Tepa
Name of Client:

Ministry of Special Development Initiatives [MSDI] (Government of Ghana)

Duration:

March 2018 – November 2020

Narrative Description of Project:

  • Prefabricated Warehouse with Attached Offices and Laboratory mounted on an in-situ concrete platform
  • Washrooms and Resting Area
  • Gatehouse
  • Chainlink fencing
  • To install the Steel Structure frame which consists of Steel beam, Steel Column, wall and roof purline, brace tie bar, and gutter which is the main structure of the building
  • To install the wall and roof panel which covers all around the building which has high efficiency of heat preservation
  • To install all the components which are made of bolts and rivet

 

The overall objective of the project is as follows:

  1.  To provide food between the harvest seasons and to provide seed for subsequent planting.
  2.  We must ensure that the storage systems prevent insects, pests, and even mold from compromising the precious cereal grains by using airtight containers that can kill off insects in all life stages.
  3.  Preserve the quantity if the harvest
  4.  Maintain its quality.
  5.  Maintenance of storage hygiene
 

Scope

The supply & construction of 5tons warehouses which include the scope of works as contained in the Contract are as follows;

  • Prefabricated Warehouse with Attached Offices and Laboratory mounted on an in-situ concrete platform
  • Washrooms and Resting Area
  • Gatehouse
  • Chainlink fencing
  • To install the Steel Structure frame which consists of Steel beam, Steel Column, wall and roof purline, brace tie bar, and gutter which is the main structure of the building
  • To install the wall and roof panel which covers all around the building which has high efficiency of heat preservation
  • To install all the components which are made of bolts and rivet
  • The overall objective of the project is as follows:
  • Testing and commissioning of works
  • Preparation of project management documentation including Quality management plans, environmental & safety management plan
  • Methodology